Near Kathryn, North Dakota, a weld built with a 15 degree misalignment cracked for a decade before the Keystone line gave way, and investigators traced 3,500 barrels to a flaw baked in at the mill
“No one was hurt. Pipeline Safety Trust director Bill Caram summed up the mechanism plainly, noting that a fatigue crack grows larger with changes in pressure over time.”
Leave a Reply