Comment to the California Office of the State Fire Marshal on the Notice of Proposed Rulemaking Action (NOPA) Regarding In-Line Inspection Requirements on Hazardous Liquid Pipelines
CAL FIRE / Office of the State Fire Marshal
P.O. Box 944246
Sacramento, California 94244-2460
Attn: Jena Garcia, Code Development & Analysis
Re: Comment on NOPA Regarding In-Line-Inspection Requirements for Hazardous
Liquid Pipelines
Dear Jena Garcia:
Thank you for the opportunity to comment on the notice of proposed rulemaking action (NOPA)
regarding in-line inspection (ILI) requirements for hazardous liquid pipelines in California. It is the
Pipeline Safety Trust’s (PST) position that these proposed rules are an important advancement in
hazardous liquid pipeline safety efforts. We are encouraged to see that the California Office of the
State Fire Marshal (OSFM) is not waiting for updated federal regulations to implement commonsense pipeline safety assessment requirements that will ultimately protect communities
throughout California.
PST is the only national non-profit organization that focuses on pipeline safety. Our efforts focus on
education and advocacy, increasing access to information, and building partnerships with
residents, safety advocates, government, and industry to promote safe communities and a healthy
environment. As part of this work, PST monitors state dockets and submits comments where its
technical expertise may be beneficial.
This rulemaking is a proactive step towards improving pipeline safety, and we support requiring all
pipelines in California to be able to accommodate and utilize in-line inspection tools. We also
support the accelerated timeline for operator compliance, in addition to more frequent inspection
intervals. We do have a few comments on the specific regulatory language, outlined below:
I. § 2150. Definitions.
a. Throughout the proposal, the terms “anomaly,” “defect,” and “feature” seem to be
used interchangeably and inconsistently throughout the regulations. PST suggests
that OSFM consider defining each of these terms to avoid confusion.
b. OSFM should clarify if a pipeline that is abandoned can ever be returned to service,
either by the abandoning operator or a subsequent operator. If so, OSFM should
identify under what circumstances return-to-service is permissible.
c. OSFM limits the term “assessment” to in-line inspections. The narrow meaning of
this term as used in § 2150 would conflict with the usage of assessment at the
federal level , specifically at 49 C.F.R. §§ 195.416(c) and 195.452(c). In the CFR,
assessment is not defined but the term is used informally in the context of
performance of one of the “methods selected to assess the integrity of the line
pipe.” PST is concerned that OSFM’s use of inconsistent terminology (i.e., a
2
narrower usage of the term assessment to mean only ILI) could create confusion
and potentially decrease safety. We recommend that OSFM consider the broader
meaning of assessment currently used in the federal regulations and identify a
different term for these proposed regulations when referring to in-line inspection to
ascertain the integrity of a pipeline segment.
d. OSFM’s choice to limit “threats” to a finite list needlessly narrows the scope of the
rule and limits its effectiveness. Instead, OSFM should consider modifying this
language to remain open to new threats that might be identified. OSFM could
consider language used at 49 C.F.R. § 192.917, but at a minimum contain “must
consider include [sic], but are not limited to[.]” OSFM should also consider
incorporating by reference the ASME B31.8S-2018, Managing System Integrity of
Gas Pipelines, for an updated list of threats.
i. Please see PST’s notes regarding public availability of standards
incorporated by reference below.
e. PST believes that the proposed definition for “validation dig” is overly simplistic. As
written, an operator could in fact perform a “validation dig” without performing an
actual dig, excavation, or examination, if the operator already had empirical
evidence, observations, or field measurements. PST believes this definition should
refer to the physical process of directly examining a pipeline, noting that in some
cases the pipeline might not need to be excavated if it were located aboveground.
Perhaps, a “verification dig” is the process of performing a direct examination (in
situ) of the pipeline to compare the actual, physical condition of the pipe against
the data reported by an in-line inspection tool.
II. § 2151. Incorporated by Reference.
a. Incorporated by Reference documents (API 1160-2013, API 1163-2021, ASME
B31.4-2006, ASME FFS-1 2007, NACE SP 0102-2010, etc.) are not freely available or
online for public review. These reference documents must be made available,
especially as the OSFM makes arguments in the proposed rule that detail specific
issues within these standards. The public cannot review, verify, and otherwise
comment meaningfully on this content.
b. OSFM elected to incorporate by reference the 2nd Edition of API RP 1160 on the
basis that the 3rd Edition references another document, namely API RP 1176
(Recommended Practice for Assessment and Management of Cracking in
Pipelines), which according to the OSFM, does not use “must” or “shall” but
instead uses optional language such as “should,” “may,” or “recommended.”
Rather than incorporating the standard by reference, OSFM could fully incorporate
the desired content from the referenced standards into the regulations. OSFM also
reasons that API RP 1176 includes recommended crack remediation criteria which
are not as stringent as proposed in § 2158. Such incorporations should be
considered on a line-by-line or section-by-section basis if the reference document
fails to use appropriate language. This will also ensure transparency and
accountability.
c. OSFM’s reasoning for not using the 2017 version of NACE SP 0102 is contradictory
regarding the inclusion and usefulness of EMAT ILI tools. The version which is
currently incorporated by reference in 49 C.F.R. § 195.3 is the 2017 version.
d. PST suggests that any and all standards incorporated by reference be made
available on a publicly viewable website.
3
III. § 2153. Exemptions.
PST believes there needs to be more public transparency around operators
requesting exemptions from safety regulations. Any requests for exemptions from
an operator to OSFM should be publicly noticed and available for comment on the
OSFM website 60 days prior to a decision from OSFM. OSFM should make its
decision and rationale publicly available in a timely manner.
IV. § 2155. Higher Risk Pipeline.
a. PST requests clarification on what the difference is (or if there is one) between a
failure and a leak, as used in OSFM’s necessity descriptions for this section.
b. The proposed definition for “defect” might be narrower than common industry
usage. For example, NACE SP0102-2010 defines a defect as “a physically examined
anomaly with dimensions or characteristics that exceed acceptable limits.” ASME
B31.8S-2018 also uses this definition. In those standards, the difference between
anomaly and defect represents the change of information known about the feature
from ILI-identification to field examination. This is in contrast to the proposed OSFM
definition, which appears to only include two specific threats (manufacturing and
construction). PST encourages consistency in definitions to the extent possible to
avoid confusion for the public, operators, and inspectors. OSFM should consider
using the full language here of “manufacturing- or construction-related defects.”
c. The definition of “leak” or “reportable leak” to be a “rupture” is confusing, as not all
leaks are ruptures as that term is understood by PST. In our understanding, ruptures
represent catastrophic failure of primary containment of transported commodities,
as in an uncontrolled release of a large volume of commodity from a pipeline. Leaks
would represent smaller, less catastrophic failures of primary containment. In any
case, the definition of rupture here and the exclusion of “leaks during a certified
hydrostatic pressure test” conflicts with the definition of “rupture” at CA
Government Code § 51018 where leaks during hydrotests are included in the
definition of rupture. OSFM must amend these definitions to ensure consistency.
d. Paragraph (b) of § 2155 is written to be limited to corrosion as a root cause. PST
suggests that OSFM should consider including cracking in addition to corrosion, but
that there may be other threats that would be appropriately responsible as the
cause if acted upon by an external force.
V. § 2156. In-line Inspections (ILI).
a. Paragraph (b) of § 2156 indicates that Table 1 of NACE SP 0102-2010 contains the
“three (3) most likely threats of failure associated with the pipeline and in
accordance with Table 1 of NACE [SP] 0102-2010. ‘In-Line Inspection of
Pipelines[.]’” Table 1 contains a list of anomalies with sub-imperfections, defects,
and features that are characteristic of the anomaly type (such as crack-like
anomalies, metal loss, deformation, etc.). Since these elements are not portrayed
as “threats” as they are in ASME B31.8S, PST suggests that OSFM should list the
threats or revise the language to align with the appropriate column in Table 1 of
NACE SP 0102-2010. PST also requests clarification as to why OSFM is suggesting
the top three threats, rather than the threats that have a sufficiently high risk level.
Creating a conclusive list of three specific threats rather than requiring an operator
to assess all relevant threats by the use of an appropriate ILI tool is arbitrary and
inconsistent with the federal pipeline safety regulations at 49 C.F.R. §§ 195.416 and
4
195.452 wherein all relevant threats must be assessed by appropriate ILI tools. This
methodology could exclude threats of considerable risk because they happen to
not be in the top three threats. Additionally, this methodology does not seem to
account for emerging threats.
b. PST is concerned that § 2156 (c) could interfere with paragraph (b) if there is an
instance where long seam cracks have already been identified as one of the top
three threats in paragraph (b). Paragraph (c) should not affect the selection of the
top three threats. Similarly, paragraph (d) should also not affect the selection of the
top three threats. PST suggests adding language to § 2156 (b) that says
“notwithstanding the requirements of paragraphs (c) and (d).”
c. Paragraph (c) should explicitly include pipes with an unknown or other seam type,
as doing so will ensure that pipe where even the seam type is unknown is not
excluded from these requirements despite the fact that it could present a greater
informational uncertainty and a greater unquantifiable risk.
d. This section does not appear to consider pipeline segments which might be
unpiggable on the effective date of the Article whose current reassessment interval
will come up before the operator chooses or is otherwise required to make the
pipeline accommodate an ILI tool. PST requests clarification on how operators with
these types of pipeline segments will assess the pipeline before the 5 year deadline
for making changes to the pipeline segment to accommodate ILI tools.
VI. § 2157. Assessment Intervals.
a. Paragraph (a)(2) should have the operator considering both the largest anomaly that
might not have been detected as well as the largest known anomaly observed from
the prior assessment. Further, because the standard is not available to the public,
PST is unable to review the content of API 1160 Section 9 to determine its
appropriateness.
b. OSFM must use terms consistently throughout the proposal. The regulatory text
uses “assessment frequency” in paragraphs (a)(2) and (3) where the term
“assessment interval” seems more consistent. PST notes a similar mixing of terms
“assessment” and “inspection” throughout this section.
c. Paragraphs (a)(4) through (6) appear to contain a mix of assessment interval
directives and initial inspection requirements that might be better placed
elsewhere.
d. PST also notes that paragraphs (a)(1), (a)(4) through (6) are not consistent with the
introductory text of paragraph (a) that “[t]he operator shall consider the following
items when determining the reassessment interval[.]”
VII. § 2158. Required Validation, Field Evaluation and Repairs.
a. OSFM should consider requiring that notifications required under § 2158(b) contain
an explanation for the delay and an evaluation of how the operator will ensure the
integrity of the pipeline.
b. In § 2158(c), OSFM should be prescriptive about under what conditions and
circumstances an operator needs to meet Level 2 or Level 3 of API 1163 rather than
leaving this open to interpretation by the operator.
c. Given the increased risk of failure due to metal loss, PST believes that OSFM should
include parameters for metal-loss anomalies in the immediate repair conditions
section. We suggest OSFM look at 49 C.F.R. § 192.933(d)(1) for guidance.
5
d. PHMSA has already outlined appropriate evaluation methodologies for anomalies
such as metal loss, dents, and cracks under 49 C.F.R .§ 192.712. PST recommends
that OSFM incorporate similar requirements for these regulations.
e. It is not uncommon for different types of anomalies to interact and increase the risk
of failure. PST urges OSFM to incorporate language that specifies the interaction
criteria it expects operators to use when determining if anomalies (metal loss, crack
and crack-like anomalies, corrosion, etc.) are interacting and require remediation.
f. PST believes that there is a gap in the criteria for crack and crack-like conditions
between immediate repair and 180-day repair conditions. Immediate repair is
required when the predicted burst pressure is 1.1 times the MOP, and repair within
180-days is required when the predicted burst pressure is less than 1.5 times MOP.
PST recommends that OSFM add a criterion for 60-day repairs for crack and cracklike features to include predicted burst pressure of less than 1.25 times the MOP.
g. As used in each of paragraphs (d)(1), (d)(2), (d)(3), and (d)(4), OSFM’s proposal
requires that the various repair conditions “shall be field evaluated and
remediated” (emphasis added) within the specified time from the discovery of
condition. Each paragraph also requires that “the evaluation and remediation” of
the various repair conditions be completed prior to the next integrity assessment
interval. PST requests clarification on the usage of the word “field” in the context of
the evaluation and remediation required based on discovery of condition, and
whether that “field evaluation and remendation” is different in any way from the
“evaluation and remediation” which is required prior to the next assessment
integrity assessment interval. Potential revised language for § 2158(d)(1) could
read: “The following conditions shall be field evaluated and remediated within three
(3) days from the discovery of condition or prior to the next integrity assessment
interval listed in § 2157, whichever is earliest.”
VIII. § 2159. Pressure Reduction.
a. While PST agrees that immediate repair conditions shall consequently require a
pressure reduction of the affected pipeline, the regulatory language needs to have
more specificity on when that pressure reduction must commence. PST suggests
requiring operators to apply a twenty percent pressure reduction within 4 hours of
confirming the discovery of the condition for an anomaly specified in § 2158(d)(1).
IX. § 2160. Notifications.
a. The current language requiring operators to email copies of the ILI reports to OSFM
could be misinterpreted to allow operators to wait until they receive both the
preliminary report and final report before sending them to OSFM. PST requests that
OSFM clarify this language to explicitly state that each separate report (preliminary
and final) shall be emailed to OSFM within three (3) days of receipt from the tool
vendor.
b. As stated in previous comments outlined in this document, any requests for
exemptions from an operator to OSFM should be publicly noticed and available for
comment on the OSFM website 60 days prior to a decision from OSFM. In addition,
OSFM should require the operator to specify the section for which the exemption is
being sought.
X. § 2162. Record Retention.
6
a. It is critically important that all records related to a pipeline be retained for the
entire life of the pipeline, not just the “useful life” as currently written in these
regulations. Operators could argue that an abandoned line is no longer useful and,
therefore, delete these records. The risk here is if another operator buys the
abandoned line and wishes to recondition and place the pipeline back in service,
those records would no longer be available on an active pipeline, limiting the new
operator’s ability to have a full understanding of the asset and limiting the
regulator’s ability to comprehensively assess the safety of the pipeline. PST
proposes the following language for the introductory text of paragraph (a) “An
operator shall retain records that demonstrate compliance with the requirements of
this Article for the life of the intrastate pipeline. These records include, but are not
limited to:”
b. PST believes that the current list of records required to be retained by an operator is
not comprehensive. We urge OSFM to include the following:
i. Assessment interval determination records, including records for predicted
burst pressure and anomaly growth rate calculations, and other engineering
assessments;
ii. Written ILI program, including historical revisions;
iii. Pressure reduction calculations and justifications;
iv. Records for higher-risk pipelines required by § 2155;
v. Any other records that the operator determines necessary.
Thank you again for the opportunity to comment on this matter.
CAL FIRE / Office of the State Fire Marshal
P.O. Box 944246
Sacramento, California 94244-2460
Attn: Jena Garcia, Code Development & Analysis
Re: Comment on NOPA Regarding In-Line-Inspection Requirements for Hazardous
Liquid Pipelines
Dear Jena Garcia:
Thank you for the opportunity to comment on the notice of proposed rulemaking action (NOPA)
regarding in-line inspection (ILI) requirements for hazardous liquid pipelines in California. It is the
Pipeline Safety Trust’s (PST) position that these proposed rules are an important advancement in
hazardous liquid pipeline safety efforts. We are encouraged to see that the California Office of the
State Fire Marshal (OSFM) is not waiting for updated federal regulations to implement commonsense pipeline safety assessment requirements that will ultimately protect communities
throughout California.
PST is the only national non-profit organization that focuses on pipeline safety. Our efforts focus on
education and advocacy, increasing access to information, and building partnerships with
residents, safety advocates, government, and industry to promote safe communities and a healthy
environment. As part of this work, PST monitors state dockets and submits comments where its
technical expertise may be beneficial.
This rulemaking is a proactive step towards improving pipeline safety, and we support requiring all
pipelines in California to be able to accommodate and utilize in-line inspection tools. We also
support the accelerated timeline for operator compliance, in addition to more frequent inspection
intervals. We do have a few comments on the specific regulatory language, outlined below:
I. § 2150. Definitions.
a. Throughout the proposal, the terms “anomaly,” “defect,” and “feature” seem to be
used interchangeably and inconsistently throughout the regulations. PST suggests
that OSFM consider defining each of these terms to avoid confusion.
b. OSFM should clarify if a pipeline that is abandoned can ever be returned to service,
either by the abandoning operator or a subsequent operator. If so, OSFM should
identify under what circumstances return-to-service is permissible.
c. OSFM limits the term “assessment” to in-line inspections. The narrow meaning of
this term as used in § 2150 would conflict with the usage of assessment at the
federal level , specifically at 49 C.F.R. §§ 195.416(c) and 195.452(c). In the CFR,
assessment is not defined but the term is used informally in the context of
performance of one of the “methods selected to assess the integrity of the line
pipe.” PST is concerned that OSFM’s use of inconsistent terminology (i.e., a
2
narrower usage of the term assessment to mean only ILI) could create confusion
and potentially decrease safety. We recommend that OSFM consider the broader
meaning of assessment currently used in the federal regulations and identify a
different term for these proposed regulations when referring to in-line inspection to
ascertain the integrity of a pipeline segment.
d. OSFM’s choice to limit “threats” to a finite list needlessly narrows the scope of the
rule and limits its effectiveness. Instead, OSFM should consider modifying this
language to remain open to new threats that might be identified. OSFM could
consider language used at 49 C.F.R. § 192.917, but at a minimum contain “must
consider include [sic], but are not limited to[.]” OSFM should also consider
incorporating by reference the ASME B31.8S-2018, Managing System Integrity of
Gas Pipelines, for an updated list of threats.
i. Please see PST’s notes regarding public availability of standards
incorporated by reference below.
e. PST believes that the proposed definition for “validation dig” is overly simplistic. As
written, an operator could in fact perform a “validation dig” without performing an
actual dig, excavation, or examination, if the operator already had empirical
evidence, observations, or field measurements. PST believes this definition should
refer to the physical process of directly examining a pipeline, noting that in some
cases the pipeline might not need to be excavated if it were located aboveground.
Perhaps, a “verification dig” is the process of performing a direct examination (in
situ) of the pipeline to compare the actual, physical condition of the pipe against
the data reported by an in-line inspection tool.
II. § 2151. Incorporated by Reference.
a. Incorporated by Reference documents (API 1160-2013, API 1163-2021, ASME
B31.4-2006, ASME FFS-1 2007, NACE SP 0102-2010, etc.) are not freely available or
online for public review. These reference documents must be made available,
especially as the OSFM makes arguments in the proposed rule that detail specific
issues within these standards. The public cannot review, verify, and otherwise
comment meaningfully on this content.
b. OSFM elected to incorporate by reference the 2nd Edition of API RP 1160 on the
basis that the 3rd Edition references another document, namely API RP 1176
(Recommended Practice for Assessment and Management of Cracking in
Pipelines), which according to the OSFM, does not use “must” or “shall” but
instead uses optional language such as “should,” “may,” or “recommended.”
Rather than incorporating the standard by reference, OSFM could fully incorporate
the desired content from the referenced standards into the regulations. OSFM also
reasons that API RP 1176 includes recommended crack remediation criteria which
are not as stringent as proposed in § 2158. Such incorporations should be
considered on a line-by-line or section-by-section basis if the reference document
fails to use appropriate language. This will also ensure transparency and
accountability.
c. OSFM’s reasoning for not using the 2017 version of NACE SP 0102 is contradictory
regarding the inclusion and usefulness of EMAT ILI tools. The version which is
currently incorporated by reference in 49 C.F.R. § 195.3 is the 2017 version.
d. PST suggests that any and all standards incorporated by reference be made
available on a publicly viewable website.
3
III. § 2153. Exemptions.
PST believes there needs to be more public transparency around operators
requesting exemptions from safety regulations. Any requests for exemptions from
an operator to OSFM should be publicly noticed and available for comment on the
OSFM website 60 days prior to a decision from OSFM. OSFM should make its
decision and rationale publicly available in a timely manner.
IV. § 2155. Higher Risk Pipeline.
a. PST requests clarification on what the difference is (or if there is one) between a
failure and a leak, as used in OSFM’s necessity descriptions for this section.
b. The proposed definition for “defect” might be narrower than common industry
usage. For example, NACE SP0102-2010 defines a defect as “a physically examined
anomaly with dimensions or characteristics that exceed acceptable limits.” ASME
B31.8S-2018 also uses this definition. In those standards, the difference between
anomaly and defect represents the change of information known about the feature
from ILI-identification to field examination. This is in contrast to the proposed OSFM
definition, which appears to only include two specific threats (manufacturing and
construction). PST encourages consistency in definitions to the extent possible to
avoid confusion for the public, operators, and inspectors. OSFM should consider
using the full language here of “manufacturing- or construction-related defects.”
c. The definition of “leak” or “reportable leak” to be a “rupture” is confusing, as not all
leaks are ruptures as that term is understood by PST. In our understanding, ruptures
represent catastrophic failure of primary containment of transported commodities,
as in an uncontrolled release of a large volume of commodity from a pipeline. Leaks
would represent smaller, less catastrophic failures of primary containment. In any
case, the definition of rupture here and the exclusion of “leaks during a certified
hydrostatic pressure test” conflicts with the definition of “rupture” at CA
Government Code § 51018 where leaks during hydrotests are included in the
definition of rupture. OSFM must amend these definitions to ensure consistency.
d. Paragraph (b) of § 2155 is written to be limited to corrosion as a root cause. PST
suggests that OSFM should consider including cracking in addition to corrosion, but
that there may be other threats that would be appropriately responsible as the
cause if acted upon by an external force.
V. § 2156. In-line Inspections (ILI).
a. Paragraph (b) of § 2156 indicates that Table 1 of NACE SP 0102-2010 contains the
“three (3) most likely threats of failure associated with the pipeline and in
accordance with Table 1 of NACE [SP] 0102-2010. ‘In-Line Inspection of
Pipelines[.]’” Table 1 contains a list of anomalies with sub-imperfections, defects,
and features that are characteristic of the anomaly type (such as crack-like
anomalies, metal loss, deformation, etc.). Since these elements are not portrayed
as “threats” as they are in ASME B31.8S, PST suggests that OSFM should list the
threats or revise the language to align with the appropriate column in Table 1 of
NACE SP 0102-2010. PST also requests clarification as to why OSFM is suggesting
the top three threats, rather than the threats that have a sufficiently high risk level.
Creating a conclusive list of three specific threats rather than requiring an operator
to assess all relevant threats by the use of an appropriate ILI tool is arbitrary and
inconsistent with the federal pipeline safety regulations at 49 C.F.R. §§ 195.416 and
4
195.452 wherein all relevant threats must be assessed by appropriate ILI tools. This
methodology could exclude threats of considerable risk because they happen to
not be in the top three threats. Additionally, this methodology does not seem to
account for emerging threats.
b. PST is concerned that § 2156 (c) could interfere with paragraph (b) if there is an
instance where long seam cracks have already been identified as one of the top
three threats in paragraph (b). Paragraph (c) should not affect the selection of the
top three threats. Similarly, paragraph (d) should also not affect the selection of the
top three threats. PST suggests adding language to § 2156 (b) that says
“notwithstanding the requirements of paragraphs (c) and (d).”
c. Paragraph (c) should explicitly include pipes with an unknown or other seam type,
as doing so will ensure that pipe where even the seam type is unknown is not
excluded from these requirements despite the fact that it could present a greater
informational uncertainty and a greater unquantifiable risk.
d. This section does not appear to consider pipeline segments which might be
unpiggable on the effective date of the Article whose current reassessment interval
will come up before the operator chooses or is otherwise required to make the
pipeline accommodate an ILI tool. PST requests clarification on how operators with
these types of pipeline segments will assess the pipeline before the 5 year deadline
for making changes to the pipeline segment to accommodate ILI tools.
VI. § 2157. Assessment Intervals.
a. Paragraph (a)(2) should have the operator considering both the largest anomaly that
might not have been detected as well as the largest known anomaly observed from
the prior assessment. Further, because the standard is not available to the public,
PST is unable to review the content of API 1160 Section 9 to determine its
appropriateness.
b. OSFM must use terms consistently throughout the proposal. The regulatory text
uses “assessment frequency” in paragraphs (a)(2) and (3) where the term
“assessment interval” seems more consistent. PST notes a similar mixing of terms
“assessment” and “inspection” throughout this section.
c. Paragraphs (a)(4) through (6) appear to contain a mix of assessment interval
directives and initial inspection requirements that might be better placed
elsewhere.
d. PST also notes that paragraphs (a)(1), (a)(4) through (6) are not consistent with the
introductory text of paragraph (a) that “[t]he operator shall consider the following
items when determining the reassessment interval[.]”
VII. § 2158. Required Validation, Field Evaluation and Repairs.
a. OSFM should consider requiring that notifications required under § 2158(b) contain
an explanation for the delay and an evaluation of how the operator will ensure the
integrity of the pipeline.
b. In § 2158(c), OSFM should be prescriptive about under what conditions and
circumstances an operator needs to meet Level 2 or Level 3 of API 1163 rather than
leaving this open to interpretation by the operator.
c. Given the increased risk of failure due to metal loss, PST believes that OSFM should
include parameters for metal-loss anomalies in the immediate repair conditions
section. We suggest OSFM look at 49 C.F.R. § 192.933(d)(1) for guidance.
5
d. PHMSA has already outlined appropriate evaluation methodologies for anomalies
such as metal loss, dents, and cracks under 49 C.F.R .§ 192.712. PST recommends
that OSFM incorporate similar requirements for these regulations.
e. It is not uncommon for different types of anomalies to interact and increase the risk
of failure. PST urges OSFM to incorporate language that specifies the interaction
criteria it expects operators to use when determining if anomalies (metal loss, crack
and crack-like anomalies, corrosion, etc.) are interacting and require remediation.
f. PST believes that there is a gap in the criteria for crack and crack-like conditions
between immediate repair and 180-day repair conditions. Immediate repair is
required when the predicted burst pressure is 1.1 times the MOP, and repair within
180-days is required when the predicted burst pressure is less than 1.5 times MOP.
PST recommends that OSFM add a criterion for 60-day repairs for crack and cracklike features to include predicted burst pressure of less than 1.25 times the MOP.
g. As used in each of paragraphs (d)(1), (d)(2), (d)(3), and (d)(4), OSFM’s proposal
requires that the various repair conditions “shall be field evaluated and
remediated” (emphasis added) within the specified time from the discovery of
condition. Each paragraph also requires that “the evaluation and remediation” of
the various repair conditions be completed prior to the next integrity assessment
interval. PST requests clarification on the usage of the word “field” in the context of
the evaluation and remediation required based on discovery of condition, and
whether that “field evaluation and remendation” is different in any way from the
“evaluation and remediation” which is required prior to the next assessment
integrity assessment interval. Potential revised language for § 2158(d)(1) could
read: “The following conditions shall be field evaluated and remediated within three
(3) days from the discovery of condition or prior to the next integrity assessment
interval listed in § 2157, whichever is earliest.”
VIII. § 2159. Pressure Reduction.
a. While PST agrees that immediate repair conditions shall consequently require a
pressure reduction of the affected pipeline, the regulatory language needs to have
more specificity on when that pressure reduction must commence. PST suggests
requiring operators to apply a twenty percent pressure reduction within 4 hours of
confirming the discovery of the condition for an anomaly specified in § 2158(d)(1).
IX. § 2160. Notifications.
a. The current language requiring operators to email copies of the ILI reports to OSFM
could be misinterpreted to allow operators to wait until they receive both the
preliminary report and final report before sending them to OSFM. PST requests that
OSFM clarify this language to explicitly state that each separate report (preliminary
and final) shall be emailed to OSFM within three (3) days of receipt from the tool
vendor.
b. As stated in previous comments outlined in this document, any requests for
exemptions from an operator to OSFM should be publicly noticed and available for
comment on the OSFM website 60 days prior to a decision from OSFM. In addition,
OSFM should require the operator to specify the section for which the exemption is
being sought.
X. § 2162. Record Retention.
6
a. It is critically important that all records related to a pipeline be retained for the
entire life of the pipeline, not just the “useful life” as currently written in these
regulations. Operators could argue that an abandoned line is no longer useful and,
therefore, delete these records. The risk here is if another operator buys the
abandoned line and wishes to recondition and place the pipeline back in service,
those records would no longer be available on an active pipeline, limiting the new
operator’s ability to have a full understanding of the asset and limiting the
regulator’s ability to comprehensively assess the safety of the pipeline. PST
proposes the following language for the introductory text of paragraph (a) “An
operator shall retain records that demonstrate compliance with the requirements of
this Article for the life of the intrastate pipeline. These records include, but are not
limited to:”
b. PST believes that the current list of records required to be retained by an operator is
not comprehensive. We urge OSFM to include the following:
i. Assessment interval determination records, including records for predicted
burst pressure and anomaly growth rate calculations, and other engineering
assessments;
ii. Written ILI program, including historical revisions;
iii. Pressure reduction calculations and justifications;
iv. Records for higher-risk pipelines required by § 2155;
v. Any other records that the operator determines necessary.
Thank you again for the opportunity to comment on this matter.